| |

| shenyang modern traffic facility co.ltd is a specialized enterprise of the development and the production of the necessary facility,and the project constructin on highgrade highway.the company covers an area of 8000 square meters,the fixed asset is 9 million yuan ,and the branches and offices are set up in beijing,shanghai,guangzhou,chengdu and xi’an. the company has passed …… |
|
 |
classical project |
 |
|
|
|
|
| |
 |
hydraulic monkey pil |
 |
|
hydraulic monkey pile-drive
|
|
xddz-y2200
|
application
the hydraulic monkey pile-driver is special equipment used for driving express highway protective grating.
design features
fluid drive running, positioning, pile driving, pile extraction.
it has the features of pile driving, pile extraction, and quick positioning and high efficiency, and stable performance, and flexible operation, being applicable to driving construction of different geology.
main technical parameters
|
dimensions
|
2200x200x4210mm
|
|
engine power
|
12.1kw
|
|
weight of complete machine
|
2000kg
|
|
hydraulic system pressure
|
10mpa
|
|
hydraulic system flow
|
37l/min
|
|
weight of hammer head
|
320kg
|
|
impulse force of hammer head
|
a bout 3,000kg
|
|
maximum hoisting height of hammer head
|
3300mm
|
|
 |
|
|